PROCESS


01

On-site Foundations& Traditional Build Frame(Traditional foundations are laid on site. If there are any traditionally constructed areas, the framework for this is erected. The works on site take place simultaneously with the modular steel fabrication, fit, and delivery.)

02

Steel Fabrication (The steel structure of our containers is fabricated on our special container production line. The modules are fully welded steel boxes and utilize shipping container technology. Due to this the modules are inherently strong and can be stacked up to 18 stories high.)

03

Module Fit Out (Once the steel structure of the modules is completed, they are transferred to our fit-out workshop. Here, modules are insulated and fire-lined, and stud work is added. First and second fix services are installed before the rooms are finished and FF&E is added.)

04

Delivery (Modules are transported from our factory to destination by barge, where they are transferred to a standard container vessel. The container vessel delivers the modules to a local port, approximately a 4-6 week journey, where they are transferred to standard flatbed vehicles and delivered to the site by road.)

05

Lifting on site (Modules are lifted into place using a crane and bolted together using our patented connector system of BM and MM plates within acceptable building tolerances. Once erected, modules are inspected by both a third party and a client representative prior to handover.)

06

Assembly & Completion (On site, modules are zipped up to make good the joints between modules, horizontal and vertical service runs are installed, external cladding is applied and traditional rooms are finished.)